Frage von Letsche:I have now for the first time a Project in Final Cut Pro with cameras multiply processed. These were to P2s. The time code was, of course asynchronously, so I had to synchronize the clips manual. And there was the problem. The cameras were running through it, but it put the data even from a 10-minute clips on the SD cards. But since I did not synchronize all the clips manual, I have every zuächst Camera Excluding mov and then synchronized the clips. But this is not the cleanest method.
Can someone tell me how easy it is?
Thanks in advance!
Antwort von mon3:
You are not helping now, but next: not sure that you can use the clip in full length? I recently a 90-minute Performance with my P2 rotated, that was in use, all in one piece for avid.
normally it should be so that you have the clips in the cut so as you can use eg the camera. in the thumbnail mode display is) a clip (; no preference as long as one used in the average synonymous.
could possibly be s.Final Cut Pro does not recognize that the clip as a whole.