Frage von Stefan A.:Hi All,
I work with the Pinnacle Studio version plus8.
Maybe someone knows why can not different films in a film project with integrate different fps. I was editing a film with 25 fps and wanted to integrate a part that has sent me a friend and rotated. Bit of it! Error message reads: "A fps 3o Project can not be integrated into a 25 fps project." Expects the software to avoid the car? What should I do?
Many thanks already times in advance
Stefan A.
Antwort von Wolf-007:
You must initially bring the fps to 25 () own program!
Antwort von Voltz:
30 fps does not meet the standard.
Trying times, as with the video
Antwort von Stephan Kexel:
30 fps does not meet the standard.
Trying times, as with the video
Antwort von Fan29:
The PAL - standard.
PAL has 25 representatives FPS
NTSC (which is probably the size of the "Fremdfilmer") is 30 frames per second
Antwort von Markus:
I assume the video recordings with 30 fps are of a digital camera. Then you are most likely correspond to the synonymous Resolutionnicht the PAL standard.
Antwort von Stephan Kexel:
The PAL - standard.
PAL has 25 representatives FPS
NTSC (which is probably the size of the "Fremdfilmer") is 30 frames per second
Ah!
Antwort von Stefan A.:
Yep, the movies of my "Fremdfilmer is" actually a camera, runs with 30 fps and can not be integrated into my current 25 fps project.
Thank you for the tip with TRex. 'll Go look for him.
Know how someone else can integrate a movie with 30 fps in a 25 fps project?
Thanks in advance
Greetings Stefan A.
Antwort von Fan29:
Loading the 30 FPC - but erstmal clip into a new Project and it will create an AVI with 25 FPS. This in turn you can then integrate into your other project.
Antwort von Stefan A.:
So, I have just scoured out my pinnacle software, but Nirg found something about how I take a 30 fps 25 fps movie as avi. Has anyone done this before? The help function as not involving a next ....
Greetings to the forum
Stefan A.
Antwort von Voltz:
Try it once mt TREX (link above)
Thus, it should really go.
Antwort von Rüdiger:
Hello,
I've now moved Trex and wants to convert, but somehow converts of all in 29.97fps. I am mystified. Does anybody advice?? Wäre echt super ...
THANK YOU!!
Antwort von Vitrend:
The attempt to convert it to NTSC. I do not know Trex, but the program can perform standard synonymous changes. Otherwise, you need a standard Wandlungssoftare. But if there is, as far as I know not for free. In other words, does such software beastly money. Quality is not synonymous particularly well.
Greeting
Vitrend
Antwort von prem:
No idea whether the program can perform standard synonymous changes. I just want a video, which unfortunately is included with 30fps at pinnacle in a project with the videos with 25fps are included insert. But this must somehow be possible without major condittions. or do I look for another video editing program??
Antwort von Vitrend:
When asked whether it is easy to make: NO.
When asked whether you need a different editing program: NO.
A video with 30 fps is very unusual. Even NTSC has a different refresh rate, namely 29, xxxx.
This looks bad.
Greeting
Vitrend
Antwort von Binebine:
Am now a bit next, and so clearly I would not say NO now :-)
I found Virtual Dub and with the program it was very easy to convert my video of 30fps at 25fps. Even now I can install the Pinnacle completely in my Project.
Now the problem. The sound is faster than the film. Bissl doof :-)
For this purpose, perhaps iene idea??
And thank you in advance
Regards
Rudiger