Infoseite // Problem with sync of 25/29.97FPS Clips



Frage von gordek:


Hi folks,

First of all a "hello" in the round, because this is my first posting here. I hope I continue here synonymous itself can help sometimes.

But now to my problem: I 2 clips in Premiere, Clip 1, 29.97 fps the 2nd clip is 25fps. Khz audio clips in both 48000th The Premiere Project has set 25fps. The audio track is on the same two clips.

When I put the clips together now, start the audio track is a long time synchronously, with time, the track gets 29.97 something "off", one gets the feeling that she is a little faster. If it is synonymous to the track so 25fps, so the shift.

How do I get now, a devil, both synchronously? About "interpret footage" I thought, interpret 29.97fps track to 25fps, but unfortunately it will be slower than the audio track of 25fps film. Am unfortunately s.Ende with my Latin. Can someone explain to me and even have a workaround for me? Am grateful for any help.

LG,

Gordek

Space


Antwort von toxitobi:

Is it possible that your 29.97 fps 30 fps and are in reality you have any reason after a while the Desynchronproblem? The footage as 30fps zuinterpretieren could help.

Greeting Toxitobi

Space


Antwort von gordek:

Nee, are 100% 29.97fps.

Space


Antwort von toxitobi:

Yes it would make sense synonymous honest, if this is interpreted as 30 fps, because even then they are faster. Other way round they would play more slowly, a fallacy. What used NLE and what camera / format do you have?

Greeting Toxitobi

Space






Space





slashCAM nutzt Cookies zur Optimierung des Angebots, auch Cookies Dritter. Die Speicherung von Cookies kann in den Browsereinstellungen unterbunden werden. Mehr Informationen erhalten Sie in unserer Datenschutzerklärung. Mehr Infos Verstanden!
RSS Suche YouTube Facebook Twitter slashCAM-Slash