Infoseite // Project Manager in Premiere CS3 spins or I?



Frage von Cindy78:


Dear People,

various forums and searched but found nothing.

If I were in the Project Manager button, collect files Other ..''activate the original project is equal to the project outcome.
Thought would be a little bit.

Even wilder is true for,, New Project to create tailored''Because an even swells Original Project of 29 GB to 283 GB fabulous!

At least this should work but made an appreciable evaporation.

Bin Even after several attempts baffled. Well this is as a rookie ...

Thanks for your tips

Cindy aus Berlin (Marzahn not :-)

Space


Antwort von B.DeKid:

Gude

What did you do exactly as before?

Defeniere times, please. Here you will find will certainly help you are looking for.

Alla
MfG
B. DeKid

Space


Antwort von Debonnaire:

So, we want to time the "Project" clearly define all the files that you have to create a movie using Premiere Pro to employ and not just the actual Premiere Pro project file!

Often, you have tons of material that you clean in a "per project" a clear folder structure've stored, but what you s.Ende the film preparation for a large proportion do not, or only for (small) parts have really used.

HERE is the savings potential of the project manager! If you, after completion of the film, the project manager contracts, the Project and to consolidate in a new folder, all used raw materials (including any handles (a few frames before and after the clip actually used)) to act together, then in the usually the PP project file will be smaller and the size of the overall project (see definition input) MASSIV even shrink!

If you then ABSOLUTELY SURE that you gecaptureten your clips with nothing more than the finished film will make more project / you, then you can have the original project (the entire folder structure with content) delete. What remains is the new, consolidated / streamlined / gestreamlinete Project.

Why now is because the PP project file actually smaller in this process? Look in the project file inside (Just open Notepad with Windows, is as nothing next ne XML file): Here, for each imported asset (clips, graphics, audio files), multiple entries with full filepath and Zugemüse. This is synonymous for assets that nowhere FILM IN were used. All of these entries (in the text of the PP project file) will be eliminated! And the merging of the project through the project managers are not used synonymous Assets NOT copied over.

Therefore, the project manager works wonderfully and reduces the entire project tree to the USED MINIMUM!

The use of project manager but has a massive disadvantage synonymous: Who, like me, a rigorous folder structure (the clips in the folder "video" audio in "Audio", graphics in "Picture", project files in the "Project", etc.) comply with then even within the PP project file copies using bins to keep the overview, which makes the Project Manager wicked dash through the bill, because all this (the project file plus assets) into a single folder reinpackt. Corrosive!

Well, there's always a price to pay! :-) You have to decide: save disk space vs.. Overview and Rules!

Space


Antwort von Cindy78:

Hello out there,

in order to explain it briefly. Project is beautifully unspectacular. HD material of an hour and a half with smooth transitions and a little background music. Footage is partitioned hard drive on E:.
Music is on C:.
No SFX. No major changes s.Rohmaterial.
The finished Project s.Encore over with DVD menu and accidentally burned. So far everything chic. Will the Project is now a little Evaporate. So last Project premiere opened again and the project manager said I would like. Now the manager tells me how he likes because it has. See above ...

Now inflates the Project from about 10-fold. 29GB -> 283GB to an estimated

With security an application error but I do not climb behind.

Thanks sBDeKid and Debonnaire!

Greetings from B. of C.

Space


Antwort von Debonnaire:

What happens during a consolidation course of a project with the project manager is that it ALL material in ONE directory HOLT!

If you are in your project size measurement of only the contents of the folder at / PP to your project file you expected, the outsourced raw material (for example, the music on C: and the clips on E:) but not synonymous to have counted, then it can demonstrated that the consolidated Project (PP-PLUS project file used raw materials) is then larger than the original folder tree was.

Look closer look!

Space





slashCAM nutzt Cookies zur Optimierung des Angebots, auch Cookies Dritter. Die Speicherung von Cookies kann in den Browsereinstellungen unterbunden werden. Mehr Informationen erhalten Sie in unserer Datenschutzerklärung. Mehr Infos Verstanden!
RSS Suche YouTube Facebook Twitter slashCAM-Slash