Frage von Wedding_HDV:Hello Together,
right to the point:
have a project with a sequence. In the sequence, a four-minute film is put together. For this short film but I have played 3 hours raw material.
Problem:
I wanted to create a tailored project through Project Manager and archive the Klip. In the end I get a Project with 27.6 GB in size. Size of the original project is 27.8 GB.
As is true but what is not. Premiere ought to copy these 4 minutes, dranhängen a second front and rear - that's all. The Project Solte than a couple GB.
what am I doing wrong?
Antwort von VA_Pechstein:
You just try all the useless time "sequences (rough cuts, etc.) from the Project delete them. Perhaps processed premiere here still something you do not really need.
Antwort von RickyMartini:
Project -> Projext Manager ...
Project -> Remove Unused
So you can zoom out a project to a minimum.
Antwort von Wiro:
Experience shows that the consolidation (cutting works!) Of a project only when intra-frame coded footage (DV / AVI / MOV).
LongGOP footage (HDV / AVCHD) will not cut, however - it also copies the entire clip was synonymous only 1 sec when using them in the timeline. Clips, which are in the project window, but were not used in the timeline, be omitted in the consolidation.
As far as my observations.
Greeting Wiro