Infoseite // HDV material with 50 instead of 25fps



Frage von Johnny:2:


Hello everybody.
I have the following problem and would be very happy if I could help someone:
I have available in the format 720p25 HDV footage. When I import the clips into PremierePro2 to function properly, most synonymous. But some clips with 50fps imported. The strange thing is that the video information is played here, although twice as fast, audio but with 25fps, so at normal speed - thus missing half the audio track I have always (since the clip is indeed running twice as fast, normal, the audio track but it is ). If I put down the material to 25fps, so synonymous is the soundtrack down to half speed - and as I said yes, it is missing half.
I open the clips in the media player but he plays them off at normal speed and full audio track. (Also, Movie Maker recognizes the normal speed, and full audio track).
I Drag the clip into an audio program (Samplitude / Audition) recognizes this again, only half of the clip.

Does anyone know this problem and a solution is at hand? Wäre echt super, I've run out of ideas, namely ...

Many greetings and merci.

Space


Antwort von AndyZZ:

At worst, you can in the video premiere - separate from the audio portion. Then you can bring your video to 25fps, while the audio is running unmolested as before.

Space


Antwort von Johnny:2:

This indeed is not - because to me the audio track so only half is available ...

Space


Antwort von clint:

Hi Johnny:)
You could try the MPEG file to import as video and audio to split reinzuholen (eg demux with TMPGEnc) and separately.

gG from Frankfurt
clint

Space





slashCAM nutzt Cookies zur Optimierung des Angebots, auch Cookies Dritter. Die Speicherung von Cookies kann in den Browsereinstellungen unterbunden werden. Mehr Informationen erhalten Sie in unserer Datenschutzerklärung. Mehr Infos Verstanden!
RSS Suche YouTube Facebook Twitter slashCAM-Slash